A can do a job in 10 days and B can do it in 15 days. How many days will they take working together?
- A5 days
- B6 days ✓ Correct answer
- C7 days
- D12 days
✓ Correct answer: 6 days
Full explanation
They will take 6 days. In one day they do 1/10 + 1/15 = 5/30 = 1/6 of the job, so the whole job takes 6 days. Why the others are wrong: 5 days — 5 days is half of A's time alone, but B is slower than A, so together they cannot finish in 5 days. 7 days — in 7 days they would do 7/6 of the job, more than the whole job. 12 days — this is between A's and B's times alone, but working together must be faster than either one alone.
MathematicsTime & Work CSS PPSC FPSC NTSID: MTH-032
A can do a job in 12 days. After working alone for 4 days, A leaves, and B finishes the remaining work in 8 days. How long would B take to do the whole job alone?
- A10 days
- B12 days ✓ Correct answer
- C16 days
- D24 days
✓ Correct answer: 12 days
Full explanation
In 4 days A does 4/12 = 1/3 of the job, leaving 2/3 for B. B does 2/3 of the job in 8 days, so B's rate is 1/12 of the job per day, and B would take 12 days. Why the others are wrong: 10 days — B took 8 days for just 2/3 of the job, so the whole job must take longer than 10 days. 16 days — that would mean B does 1/16 of the job per day and would need 12 days for 2/3 of it, not 8. 24 days — that would mean B does 1/24 of the job per day and would need 16 days for 2/3 of it, not 8.
MathematicsTime & Work CSS PPSC FPSC NTSID: MTH-060
A can do a job in 20 days and B can do it in 30 days. How many days will they take working together?
- A12 days ✓ Correct answer
- B25 days
- C15 days
- D10 days
✓ Correct answer: 12 days
Full explanation
Together they take 12 days. A does 1/20 of the job per day and B does 1/30, so together they do 1/20 + 1/30 = 1/12 of the job per day, which means the job takes 12 days. Why the others are wrong: 10 days — the pair does 1/12 of the job per day, so the job takes 12 days, not 10. 15 days — the pair does 1/12 of the job per day, so the job takes 12 days, not 15. 25 days — 25 days is the average of 20 and 30, but working together is faster than either worker alone.
MathematicsTime & Work CSS PPSC FPSC NTSID: MTH-090
A can do a job in 6 days and B can do it in 12 days. How many days will they take working together?
- A3 days
- B6 days
- C4 days ✓ Correct answer
- D9 days
✓ Correct answer: 4 days
Full explanation
They take 4 days. Together they do 1/6 + 1/12 = 1/4 of the job in one day, so the whole job takes 4 days. Why the others are wrong: 3 days — in 3 days they would do only 3/4 of the job. 6 days — this is the time A takes alone, and two workers together must be faster. 9 days — this is the average of 6 and 12, but working together does not use the average.